In April 2020, at the height of the initial wave of COVID-19, Precision was called at 6 p.m. by the U.S. Department of Justice: A COVID outbreak had infected more than 100 inmates and staff members at the U.S. Penitentiary Lompoc — the largest documented outbreak at a federal prison at the time — and a construction crew was needed immediately for a Design-Build emergency hospital.
Precision had a team on site at 6 a.m. the next morning and completed the project in less than a month. Scopes included acute-care isolation rooms, an HVAC system with negative pressure, ducting, ceiling boxes for exhaust and makeup air, plenum boxes, exhaust fans, glass walls/doors, flooring, drywall, plumbing, cabinetry, and finishes.
The COVID care unit was built within a decommissioned prison factory on the grounds of the medium-security facility within the Federal Correctional Complex Lompoc, known as USP Lompoc. The unit comprised 10 double-occupancy acute care treatment rooms equipped with negative pressure, a patient intake room, nurses’ station, pharmacy, linen exchange room, biohazard room, and medical supply storage room. Other areas were retrofitted to create an officers’ station, staff lounge and locker room with showers.
This fully staffed medical unit allowed the facility to treat inmates within the prison, rather than sending them to local hospitals, thus helping to contain the outbreak.
As a result of the Lompoc project, Precision became known among facilities managers for its quick response time and ready willingness to visit sites, discuss specific project requirements, and tailor the construction approach to those requirements. The U.S. Bureau of Prisons facilities manager, Aaron Wilkerson, wrote in his 2021 review: “They (Precision) are the best-managed construction team we have worked with.”